Maximising return from ageing assets
Engineering Analysis
- Review design documentation, operational and IMR records
- Detail analyses performed for critical components
- Installation options to minimise shut-downs
- Risk assessment
Economic Analysis
- Review production history and estimates
- Define options, cost of options, option optimisation and recommendations
- Total cost of extension vs. return
- Schedule component repairs/replacements to optimise cash flow
